Question Bank – OPERATING ( For Group “B” / Guard / Station Master and so forth)

Question Bank – OPERATING ( For Group “B” / Guard / Station Master and so forth) Part – 1A- Fill within the clean

Question Bank – OPERATING ( For Group “B” / Guard / Station Master and so forth) Part – 1A-  Fill within the clean

Part I

Fill within the blanks:

1.  Working schedule is issued with the joint signatures of COM and ______.

2. There are _________ chapters within the guide of G & SR.

3. There are _________ chapters within the Accident Manual.

4. Amount of air stress within the engine and brake van of a passenger prepare on the beginning station shall be 5.zero kg/cm2 and _________.

5. ________ mm of flat tyre is permitted within the locomotive of a items prepare.

6. Guard shall present hand by day and __________ by evening to the S.M. if the prepare is

standing away from fouling mark.

7. Caution indicator is positioned at a distance of _________ metres from the pace

indicator on a plain stage.

8. Maximum pace of ‘A’ class ODC is ______ km/h.

9.Train coming into into sand hump is a _________ sort of accident.

10.  Maximum permissible pace is set by ____________.

11.  Maximum pace whereas operating by over 1 in Eight ½ flip-out with curved change is ________.

12. Caution board is positioned at a distance of ______ metres from the cease board.

13. Speed whereas dropping ballast from materials prepare throughout run is _________.

14.  If ‘A’ marker is extinguished in computerized part, sign is handled as _____.

15.   Sound of two hooters means ____________.

16. Block over lap in MAUQ signaling system is ___________.

17.  Information of everlasting pace restrictions is offered in ____________.

18. In case of prepare parting, Guard shall present ____________ by day.

19.  In case of prepare parting, Guard shall present ______________ by evening.

20. In case of prepare dividing, hand brakes of _______ wagons of the remaining load are pinned down.

21. Loco Pilot shall sound ________ whistle whereas passing the IBS at ON after being

licensed by the SM in rear.

22. First detonator is positioned at a distance of _______ metres from the obstruction in

slender gauge.

23.  Before demanding aiding engine, prepare is to be protected against _________.

24. Speed of the primary prepare throughout ACF on double line is ____________ km/h.

25. During ACF on single line, T/B 602 is issued to Loco Pilot to _____________.

   ANSWER

1)  CPTM            2) 18         3) 8          4) 4.8Kg/cm²        5) 50mm                6)   White mild7) 770                8) Normal     9) Indicative Accident      10)  CRS    11) 15 kmph      12) 1170

13) Eight km/h         14)  Manually operated          15) ART required at Home station   16) 180 meter

17)  WTT        18) Green flag vertically up and down,    19) White lamp vertically up and down

20) 10 Unit or 50% whichever is extra    21) quick lengthy quick    22) meter  23)  each instructions

24)  25/10/strolling               25) To open the communication

 Fill within the blanks:

26. During shunting Impact pace of 5 field wagons is _________.

27. Validity of the brake energy certificates of air braked materials prepare is ________.

28. In ghat part, distance between warning and pace indicator is _______.

29. When prepare is split, Guard shall concern _______ authority to Loco Pilot.

30. Number of the Train Intact Arrival Register is __________.

31. Speed of first prepare throughout momentary single line working is _______ km/h.

32. To clear the part, most pace of the prepare with flat tyre is _____ km/h.

33. Maximum pace when head mild turns into faulty is ____________.

34. Loco Pilot shall sound ____________ whistle to name Guard to Engine.

35. Train is protected against __________ in a single prepare solely system.

36. Brake energy within the C C rake items prepare at a beginning station shall be ____%.

37. Stop indicator is positioned at a distance of ________ metres from the place of

obstruction.

38. On seeing faulty cease sign throughout prepare working, Loco Pilot will sound

____________ whistle to tell the identical.

39.  In the absence of crimson mild in hand sign lamp, hazard sign may be proven by______________.

40. Medical aid van shall be dispatched inside __________ minutes from double exit siding.

41. Speed of second prepare throughout momentary single line working is _________.

42. For extinguished dwelling sign, Loco Pilot might be issued __________ authority kind the station in rear in MACLS system.

43. Speed of prepare with out brake van whereas passing by a station is _______.

44. Section controller shall transmit the proper time at _______ hours each day to all of the stations.

45. Seciton controller is accountable for _________ on a bit of a railway supplied with the system of speech communication.

46.  Approved particular directions are issued by _____________________.

47.  Special directions are issued by ___________________.

48. While clearing the load with an invalid brake energy certificates, if prepare examiner isn’t out there, Loco Pilot and Guard shall ensrue security of the prepare and take the prepare upto _________________.

49. TSL is began between these two stations at which cross over facility can be found and ____________ is handled as closed.

50. Maximum No. of _______ observe machines may be despatched for working in a block part.

ANSWER

26) 2 km/h      27) days       28)  meter     29) T / 609        30) T / 1410                  31) 25 km/h

32) 20 km/h       33) 40 km/h          34) Two lengthy two quick        35) Base station       36) 100

37) meter           38) One lengthy two quick    39) violently waving a white horizontally throughout the physique

40) 15           41)  Normal        42) T / 409       43)  Normal        44) 16.00     45) motion of Traffic

46) CRS       47) COM             48)  subsequent study     49)  C class / IBS       50) 5

 Fill within the blanks:

51. Speed of prepare shall not be greater than ______________ km/h in case of whistle failure in block part.

52.  Max. Speed of passenger prepare hooked up with 4 wheeler wagon shall be _____km/h.

53. Block competency certificates is given within the prescribed kind ____________.

54. Block competency certificates is issued by ____________________.

55.  Gateman competency certificates of interlocked visitors gate is signed by TI and SE

(Sig) and counter signed by _____________.

56. Record of warning order is stored for __________ months.

57. Knowledge of subsidiary guidelines is examined by ____________ if prepare working workers of

one other Railway is required to work on our Railway.

58. All the authorities associated to TSL working are examined by TI and its report is submitted to DRM inside _________ days of resumption of regular working.

59. Rake hyperlink guide-let is ready by COM and _________.

60.Station working guidelines of an interlocked station is ready by Sr. DOM and _________.

61. Station supervisor of an enormous station shall examine the cabins atleast as soon as in _________.

62. Signal sighting committee shall submit its report on kind _______________.

63. For overhauling of lever body at stations, _________ is ready collectively by Sr. DOM and DSTE for working of trains.

64. When sign isn’t seen from minimal sighting distance, ________ sign is offered.

65. Sounding of 5 hooters means_____________________.

66. If a member disagrees with the explanations of the joint notice of an accident, he might give _________.

67. Air stress within the engine and brake van of a items prepare with 58 N Boxes shall be 5.zero kg/cm2 and __________ respectively.

68. Normally the prepare with scorching axle is admitted on ____________.

69. Accident drill is ordered by DRM and is performed below the supervision of ________.

70. Permissible restrict of flat tyre in items and training automobiles is 60mm and _________respectively.

71. To ship the aiding engine into obstructed block part T/A 602 authority is issued and the pace of engine shall be _________.

72. During critical accident, __________ would be the in-cost of management workplace.

73. SCOR maintains ________ register when critical accident happens.

74. Whenever new sign is put into use, sign sighting committee submits its joint report on _________ kind.

75. SM shall examine the private retailer of Guard as soon as in ________months.

ANSWER
51) 25        52) 75     53) T / 115 B     54) Principal, ZRTI       55)  AOM (G)            56) 12
57)  TI        58) 7        59)  CPTM      60)  Sr.DSTE      61)  Once in every week     62) T / 102 B
63) Temporary working order      64)  repeating          65) ART, MRV requiredat out station
66) Dissent 67) 4.7kg/cm²            68)  Main line    69)  ADRM/Sr.DSO/DSO      70) 50 mm
71) 15/10 km/h             72) Sr.DOM      73)  Chronological        74) T /102 B             75) 3
 Fill within the blanks:
76. Second prepare throughout all communication failure shall be dispatched after an interval of_____________ minutes.
77. Second prepare throughout TSL might be dispatched after __________.
78. During thick & foggy climate, line have to be clear upto _____ for granting line clear at a B’ clas station in TALQ signalling system on Double line.
79. _______ bogies may be hooked up in rear of SLR of Mail/Express prepare.
80. Point indicator reveals _______ mild when the factors are set for loop line.
81.Form variety of disconnection and reconnection is __________.
82. Clocks of management workplace shall be synchronized with All India Radio at 08:00 hours, _______ hours and 21:00 hours.
83. Max. Speed of particular prepare with 132 tonne bogie nicely wagon shall be ______ km/h.
84. “C” class ODC is run with the permission of _____________.
85. Station Working Rules of Non-interlocked station is signed by ________.
86. Loss of Railway property of __________ is handled as critical accident.
87. General guidelines could also be modified by ___________.
88. Train coming into catch siding is a kind of _______ accident as per AM 2003.
89. Signal sighting committee consists of TI, SI/PWI and _________.
90. During extended failure of indicators in computerized part, ________ authority is issued.
91. Information of warning discover stations is given in ______________.
92. If warner sign of any station turns into faulty in off situation, ________ is issued
to Loco Pilot from the sation in rear.
93. If the Distant sign of a Gate turns into faulty in off situation, __________ is issued to Loco Pilot from the station in rear.
94. Height gauge is for the security of ____________.
95. Reference of ________________ is written by the facet of the Rule if the Rule is corrected.
96. Accident drill is to be performed as soon as in ________ if no actual accident happens throughout this era.
97. Target time for dispatch of ARME from single exit siding at evening is _______ minutes.
98. While ordering ART/MRV every siren shall be sounded for ______ seconds.
99.  While cancelling ART/MRV, siren shall be sounded for _____ seconds.
100. Station Master shall give line clear with _______ whereas granting line clear.
                                          ANSWER
76) 30         77)  Line clear       78)  Home sign     79) 2      80)  inexperienced    81) S&T (T /351)
82) 13:30    83) 30 km/h           84)  CRS        85)  Sr.DOM and Sr.DEN    86) More than 2 crore
87)  Railway Board    88)  Indicative      89)  LI      90) T / D 912     91)  WTT  92)  Written memo
93) Caution order        94)  OHE           95)  no. and merchandise no. of correction slip
96)  three months          97) 20 minute     98) 45               99) 90                  100)  Private no.

HINDI VERSION

प्रश्न बैंक – परिचालन (ग्रुप “B”, गार्ड / स्टेशन मास्टर आदि के लिए) भाग – 1 A ( रिक्त स्थानों की पूर्ति कीजिए – भाग I )

रिक्त स्थानों की पूर्ति कीजिए

  1.  संचालन समय सारणी COM एवं ——– के संयुक्त हस्ताक्षर से जारी किया जाता है
  2.  सामान्य एवं सहायक नियम पुस्तिका में ——  अध्याय है
  3.  दुर्घटना नियमावली में ——– अध्याय है
  4.  प्रस्थान स्टेशन पर एयर ब्रेक प्रणाली से सुसज्जित सवारी गाड़ी के इंजन एवं ब्रेकयान में 5.0 kg/cm2 एवं ——— प्रेशर की मात्रा होनी चाहिये
  5. मालगाड़ी के इंजन में —- मि.मी. तक फ्लेट टायर की सीमा अनुमत है
  6. जब गाड़ी उल्लंघन चिन्ह साफ करके खडी हो तब गार्ड स्टेशन मास्टर को दिन में हाथ तथा रात में —- सिगनल प्रदर्शित करेगा 
  7. सतर्कता संकेतक, गति संकेतक के समतल जगह पर —– मीटर की दूरी पर लगाया जाता है
  8. ए क्लास ओ. डी. सी. की अधिकतम गति —— km/h होती है
  9. गाड़ी का कैच साईडिग में प्रवेश —– प्रकार की दुर्घटना है ।
  10. अधिकतम अनुमेय गति —— व्दारा निर्धारित की जाती है ।
  11. साढ़े आठ में एक कवर्ड स्विच वाले टर्न आऊट से गुजरते समय अधिकतम गति —– होती है
  12. काशन बोर्ड स्टाप बोर्ड से —- मीटर की दूरी पर लगाये है ।
  13. चलती हुई सामग्री गाड़ी से गिट्टी गिराते समय गति —– होगी
  14. स्वचलखंड में यदि A मार्कर बुझा है तो सिगनल —- माना जायेगा
  15. दो हूटर बजने का अर्थ —— है
  16. MAUQ सिगनल व्यवस्था में ब्लॉक ओवर लेप —– होता है
  17. स्थायी गति प्रतिबंधो की जानकारी ——में होती है ।
  18. गाड़ी विखंडन होने पर गार्ड दिन में —— सिगनल दिखायेगा ।
  19. गाड़ी विखंडन होने पर गार्ड रात में —– सिगनल दिखायेगा ।
  20. गाड़ी विभाजन के दौरान शेष लोड के —– वाहनों के हाथ ब्रेक बांधे जायेगे
  21. पिछले स्टे. मा. व्दारा प्राधिकृत करने पर, लोको पायलट आय बी एस को आन में पार करते समय सीटी बजायेगा।
  22. नेरो गेज में पहला पटाखा अवरोध से —– मीटर के अंतर पर लगाया जायेगा।
  23. सहायता इंजन मांगने से पहले गाड़ी का बचाव —— से आवश्यक है
  24. दोहरी लाइन पर AFC के दौरान पहली गाड़ी की गति —– km/h होगी
  25. इकहरी लाइन पर AFC के दौरान लोको पायलट को —– के लिये टी/बी 602 दी जायेगी।
  26. 5 बाक्स वाहनों की शंटिग की इम्पेक्ट गति —– होती है ।
  27. एयर ब्रेक युक्त सामग्री गाड़ी की ब्रेक शक्ति प्रमाण पत्र की वैधता —– है
  28. सतर्कता संकेतक और गति संकेतक के बीच का अंतर घाट सेक्शन में  —– है
  29. गाड़ी विभाजित किये जाने पर गार्ड व्दारा लोको पायलट को – प्राधिकार दिया जाता है
  30. पूर्ण गाड़ी आगमन रजिस्टर का नं ——- है
  31. अस्थायी इकहरी लाइन संचालन के समय जाने वाली प्रथम गाड़ी की गति —– km/h होगी ।
  32.  फ्लैट टायर युक्त गाड़ी की सेक्शन क्लियर करते समय अधिकतम गति —— km/h होगी
  33. गाड़ी का हेडलाइट खराब होने पर अधिकतम गति —– होगी ।
  34. गार्ड को इंजन पर बुलाने हेतु लोको पायलट —– सीटी बजायेगा।
  35. केवल एक गाड़ी पध्दति में गाड़ी का बचाव —– ओर से किया जाता है
  36. सी सी रेक वाली मालगाड़ी में प्रस्थान स्टेशन पर —– प्रतिशत ब्रेक पावर होना चाहिये
  37. रोक संकेतक अवरोध से —– मीटर की दूरी पर लगाया जाता है ।
  38. गाड़ी संचालन के दौरान ख़राब सिगनल दिखे तो इसकी सूचना लोको पायलट —– सीटी बजाकर देगा
  39. रात के समय हाथ सिगनल बत्ती में लाल रोशनी उपलब्ध न हो तो खतरा संकेत —— प्रकार से बतायेगे
  40. चिकित्सा राहत गाड़ी दोहरा निकास होने पर —— मिनट में निकलना चाहिये ।
  41. अस्थायी इकहरी लाइन संचालन के समय दूसरी गाड़ी की गति —— होती है
  42. MACLS व्यवस्था में बुझे हुये होम सिगनल के लिये लोको पायलट को पिछले स्टेशन से —– अधिकार पत्र दिया जायेगा
  43. स्टेशन से बिना ब्रेकयान की गाड़ी थ्रू जाते समय गति —– होगी
  44. खंड नियंत्रक प्रतिदिन —– बजे अपने सभी स्टेशनो को सही समय की जानकारी देगा
  45. खंड नियंत्रक रेल के संभाषण संचालन प्रणाली से सुसज्जित पर —– के लिये जिम्मेदार होता है
  46. अनुमोदित विशेष अनुदेश —- व्दारा जारी किया जाता है
  47. विशेष अनुदेश —- व्दारा जारी किया जाता है
  48. अवैध ब्रेक प्रमाण पत्र के लोड को स्टेशन से क्लियर करते समय यदि गाड़ी परीक्षक उपलब्ध न हो तो लोको पायलट तथा गार्ड गाड़ी की संरक्षा सुनिश्चित करेगा और गाड़ी को —– तक ले जायेगा
  49. टीएसएल उन दो स्टेशनो के बीच शुरू की जायेगी जहाँ क्रास ओवर की सुविधा है और —– को बंद माना जायेगा
  50. किसी ब्लाक सेक्शन में कार्य हेतु अधिकतम —– ट्रेक मशीन भेजी जा सकती है
  51. ब्लॉक सेक्शन में इंजन की सीटी खराब  होने पर गाड़ी की गति —- km/h से अधिक नही रहेगी
  52. सवारी गाड़ी में चौपहिया वाहन लगाये जाने पर गाड़ी की गति —– km/h से अधिक नही होगी
  53. ब्लॉक सक्षमता प्रमाण पत्र —- निर्धारित फार्म पर दिया जाता है ।
  54. ब्लॉक सक्षमता प्रमाण पत्र —— व्दारा जारी किया जाता है
  55. इंटरलॉक यातायात गेट के गेटमेन के सक्षमता प्रमाण पत्र पर TI तथा SE (Sig) के हस्ताक्षर होते है तथा – काउंटर हस्ताक्षर होते है
  56. सतर्कता आदेश का रिकार्ड स्टेशन पर —— माह तक रखा जाता है ।
  57. दूसरे रेलवे के कर्मचारी  यदि अपने रेलवे में काम करते है तो उनके सहायक नियम की जानकारी की परीक्षा व्दारा की जाती है
  58. टीएसएल संचालन के बाद उससे संबंधित अधिकार पत्रों की जाँच TI व्दारा की जायेगी और उसकी  रिपोर्ट सामान्य संचालन शुरू होने के ——- दिन के अंदर डी आर एम को भेजी जायेगी
  59. रेक लिंक पुस्तिका COM तथा —— व्दारा तैयार की जाती है
  60. इंटरलॉक स्टेशन का स्टेशन संचालन नियम Sr. DOM तथा —– व्दारा बनाया जायेगा
  61. बड़े स्टेशनो पर स्टेशन प्रबंधक ब्लॉक केबिनो का निरीक्षण कम से कम —- में एक बार करेगे
  62. सिगनल साईटिंग समीति अपनी संयुक्त रिपोर्ट ——– फार्म पर डी आर एम् को भेजेगा
  63. स्टेशन पर लीवर फ्रेम को ओवर हालिंग के लिये सीनीयर डी.ओ.एम. तथा डी एस टी ई व्दारा संयुक्त रूप से गाड़ी संचालन के लिये ——– बनाया जायेगा
  64. जब सिगनल न्यूनतम दृश्यता दूरी से दिखाई न पड़े तब —– सिगनल लगाये जाते है
  65. यदि 5 हूटर न्जते है तो इसका अर्थ —— है
  66. दुर्घटना की संयुक्त नोट बनाते समय यदि कोई सदस्य कारणों से सहमत नही होता है तो वह ——-दे
  67. 58 एन बाक्स वाली मालगाड़ी के इंजन म 5.0 kg/cm2 तथा ब्रेकवान में —– एयर प्रेशर होना चाहिये
  68. सामान्यता गर्म धुर युक्त गाड़ी को स्टेशन के — पर  लिया जायेगा ।
  69. दुर्घटना ड्रिल DRM व्दारा आदेशित होता है और उसे —– के पर्यवेक्षक में कराया जाता है
  70. माल वाहन तथा कोचिंग वाहन में फ्लेट टायर की अनुमत सीमा क्रमश: 60mm और —– है
  71. अवरोधित ब्लॉक सेक्शन में सहायता इंजन भेजने के लिये T/A 602 प्राधिकार पत्र दिया जायेगा और इंजन की गति —— रहेगी
  72. गंभीर दुर्घटना के समय कंट्रोल कार्यालय के कार्यभारी —— होते है
  73. गंभीर दुर्घटना  होने पर खंड नियंत्रक व्दारा —– रजिस्टर भरा जाता है
  74. जब भी कोई नया सिगनल उपयोग में लाया जाता है तब सिगनल साइटिंग कमेटी अपनी ज्वाइंट रिपोर्ट —— फार्म पर देती है
  75. गार्ड के पर्सनल स्टोर्स की जाँच स्टे. मा. व्दारा —— महिने में एक बार की  जानी चाहिये
  76. दोहरी लाईन पर संपूर्ण संचार व्यवस्था भंग होने पर दूसरी गाड़ी —— मिनट के अंतर पर चलाई जायेगी
  77. टीएसएल में दूसरी गाड़ी —— के पश्चात् चलाई जायेगी
  78. दो संकेती सिगनल व्यवस्था में दोहरी लाईन पर धुंध और कोहरे के मौसम में बी क्लास स्टेशन पर लाईन क्लियर देने के लिये —– तक लाइन साफ होनी चाहिए
  79. मेल / एक्सप्रेस गाड़ी में एसएलआर के पीछे —– बोगी लगा सकते है
  80. कांटे लूप लाईन के लिये लगे होने पर कांटा संकेतक रात के समय —- रोशनी देता है
  81. डिस्कनेक्शन और रिनेक्शन  फार्म नंबर ———- होता है
  82. नियंत्रण कार्यालय में लगी घडी को ऑल इंडिया रेडियो के समय से 08:00 बजे,—– और 21:00 बजे मिलाना चाहिये
  83. 132 टन की वैल वैगन गाड़ी को विशेष गाड़ी के रूप में चलाया जायेगा जिसकी अधिकतम गति —— km/h होगी
  84. C क्लास ओडीसी को चलाने की अनुमती —- के व्दारा दी जाती है
  85. नॉन इंटरलॉक्ड स्टेशन का स्टेशन संचालन नियम —-के हस्ताक्षर से जारी किया जाता है
  86. रेल संपत्ती का —— नुकसान होने पर उसे गंभीर दुर्घटना माना जायेगा।
  87. साधारण नियमो में परिवर्तन —- व्दारा किया जाता है
  88. दुर्घटना नियमावली 2003 के अनुसार गाड़ी का कैच सायडिंग में प्रवेश —– प्रकार की दुर्घटना है
  89. सिगनल साईंटिंग कमेटी में TI,SI/PWI तथा —– होते है
  90. लंबी अवधि के लिये स्वचल ख़राब होने पर —— अधिकार पत्र जारी किया जाता है
  91. काँशन नोटीस स्टेशन की जानकारी ———– में दी जाती है
  92. अगर किसी स्टेशन का चेतावनी सिगनल ऑफ में ख़राब हो जाये तो पिछले स्टेशन पायलट को —–  जारी किया जाता है
  93. अगर किसी गेट का डीस्टंट सिगनल ऑफ में खराब हो जाये तो पिछले स्टेशन से —– जारी किया जाता है
  94. हाईट गेज —- की सुरक्षा के लिये होता है।
  95. किसी नियम में संशोधन किये जाने पर —– का संदर्भ पुस्तक में संबंधित नियम के बाजू में लिखना चाहिये।
  96. दुर्घटना माक ड्रिल —- में एक बार की जानी चाहिये जब इस अवधि में वास्तविक दुर्घटना न हुई हो ।
  97. रात के समय इकहरी निकास वाली सायडिंग से मेडिकल राहत गाड़ी निकलने का निर्धारित समय मिनट है ।
  98. दुर्घटना के समय ART/MRV आदेशित करते समय प्रत्येक सायरन —– सेकेंड के लिये बजाया जाता है।
  99. ART/MRV आर्डरिंग रद्द करने हेतु सायरन ———– सेकंड के लिये बजाय जाता है है ।
  100. स्टेशन मास्टर लाइन क्लियर देते समय ———— के साथ लाईन क्लियर संदेश देगा ।
वातुनिष्ठ प्रश्नों के उत्तर 

1. सी पी टी एम ,      2. 18,           3. 8,            4. 4.8kg/cm2,     5. 50mm,     6. सफ़ेद बत्ती,     7. 770,

8. सामान्य,        9. सांकेतिक दुर्घटना,         10. रेल संरक्षा आयुक्त            11. 15 kmph         12. 1170,

13. 8km/h           . हस्तचलित         15. ART की आवश्यकता होम स्टेशन पर,            16. 180मीटर

17. कार्यसंचालन समय सारणी,              18. हरी झंडी उपर नीचे,                   19. सफेद बत्ती उपर न

20. 10 यूनिट या 50% जो अधिक हो,    21. छोटी लंबी छोटी           22. 400मीटर,                     23.दोनों ओर,

24. 25/10 पैदल,          25. संचार व्यवस्था शुरू करने के लिए           26. 2 km/h               27. 15 दिन

28. 900मीटर              29. T/609,          30. T/1410,         31. 25k/h,        32.20km/h,      33. 40km/h

34. दो लंबी दो छोटी,     35. आधार स्टेशन की ओर से,     36.100,      37. 30 मीटर   38. एक लंबी दो छोटी,

39. सफ़ेद बत्ती शरीर के सामने दाए बाए जोर जोर से हिलाकर,      40. 15,     41. सामान्य,       42. T/409,

43. सामान्य,      44. 16.00,       45. यातायात के संचालन के लिए      46. रेल संरक्षा आयुक्त    47. सी ओ एम,

48. अगले गाड़ी परिक्षण स्थल,       49. सी क्लास / आई बी एस,      50. 5,          51.25,               52. 75,

53. T/115 B,      54. प्राचार्य,क्षे.रे.प्र.सं,      55. ए ओ एम(जी),        56. 12,         57. परिवहन निरीक्षण

58. 7,    59. सीपीटीएम,         60. सीनियर डीएसटीई,        61. सप्ताह में एक बार,      62. T/102B,

63. अस्थायी संचालन आदेश    64. रिपीटिंग      65. ART,MRV की आवश्यकता बाहरी          66. डिसेंट,

67. 4.7 kg/cm2,     68. मेन लाइन          69. अ.म.रे.प्र./व.मं सं अ./मं सं अ.,                   70. 50 mm,

71. 15/10 kmph,     72. व.मं.प.प्रंबधक,      73. क्रोनोलाजिकल,       74. T/102 B,  nnnn      75. 3,

76. 30,     77. लाइन क्लियर,        78. होमसिगनल        79. 2,      80. हरी,           81. S&T (T/351),

82. 13:30,       83. 30km/h      84. रेल संरक्षा आयुक्त,      85. सिनीयर डी ओ एम तथा सिनीयर डी एन,

86. दो करोड़ रूपये से अधिक      87. रेलवे बोर्ड,      88. सांकेतिक,      89 एल आई,     90. T/D 912,

91. कार्यसंचालन समय सारणी,       92. लिखीत सुचना,         93. सतर्कता आदेश,          94. ओ एच ई,

95. शुध्दी पत्र की संख्या तथा मद     96. तीन माह     97. 20 मिनट    98.45,   99.90,    100. प्रायवेट नंबर ।

Translate »